Wednesday, April 23, 2008

15/5 April 23, 2008

Well, this is it. Tomorrow is our Studio showcase and the final presentation of our project. It’s been a long road but I believe we have arrived at our destination pretty well intact. This week we worked on polishing up our lesson units as well as supervising our undergraduate students for the post-test, which is part of our formative evaluation.

We were in the company of about 31 of Dr. Powell’s students whom worked through the module and provided us feedback regarding the navigation, learning activities and interactivity. I think they did a very good job letting us know what issues they perceived. Much of it were bugs we already were aware of but it was good to see that our feedback is consistent.

Tomorrow is also my portfolio defense and I am looking forward to being behind that experience also. I’ve been talking quite a bit about the Instructional Technology program with a few of my co-workers. Since being in the program I have had one person begin the program and another who plans to start in the fall. Our school IT person also mentioned that she may be interested in finding out more about the program.

It feels pretty good to be confident and positive about a program like the IDD program. I know I gained a lot of knowledge and I would hope some of my experiences have inspired these few others to pursue this career.

Next week:
1. Enjoy the lull in activity.

Wednesday, April 16, 2008

15/5 April 16, 2008

It is already time for another 15/5, time is really flying by. This week has been very busy for the Genesis Learning Solutions team. We met on Monday, the 14th with actual camp directors to have them go through our project for content accuracy as well as provide specific feedback on several aspects of the project. I worked with John who was able to share several suggestions of areas that could be improved upon. Several suggestions were things we had been mentioned by our 6200 consultants. So we are in the process of making adjustments.

We had quite a breakthrough with some limitations with our project, thanks to Roman who was able to convert our basic design template into a CSS document. I am not sure what that means exactly, (I never really understood the concept behind CSS) except I know it allows us much more flexibility in adding additional text or graphics.

I am looking forward to getting our work to a more refined state. I noticed while the SME’s were going through the project, there were quite a few issues, especially with navigation and the wordiness of the project. One we can adjust, the other is quite a bit beyond the scope of the project. Now, I can really appreciate Dr. Branch’s detailed description and discussion on the importance of the scope document in project management. Without such guidelines, we could end up doing all sorts of things.

This week:
1. Attend SIG
2. Work on fine tuning Unit 1 (my section)
3. Meet with Dr. Powell’s undergrad’s for the beta testing (Monday)

Saturday, April 12, 2008

15/5 April 9, 2008

I admit I’m a little late posting this 15/5, although I don’t have an excuse besides poor time management, I do have a reason. We are so far into the semester and things are beginning to boil. I have completed the guided practice for Unit 1 in our module. We are working on assessment pieces for the module. Our live debut of our module was thankfully pushed back to the 21st instead of the 14th which does give our team a little breathing room.

I was happy to have completed my comprehensive examination on Tuesday, the 8th and now have that behind me. I look forward to the completion of our EDIT 6210 project as well as my EDIT 6190 project.

This week we are heavy into the alpha and beta testing for the project. Myra utilized her Survey Monkey account to provide surveys for the students in Dr. Powell’s class to complete a content pretest. We are also using this to get technical feedback from some of our EDIT 6200 consultants.

Thursday, the 10th is the dress rehearsal for the Studio Showcase which our Genesis Learning Systems team will present the ACA: Business and Finance module for the first time. There is still quite a bit of connecting of pages we need to do as well as adjustments to the content pages.
We will be able to use the technology feedback from our 6200 consultants to help determine what we need to adjust as far as page navigation and interactions. That information is very important and will need to be gathered as soon as possible.

Next week:
1. Studio Showcase dress rehearsal
2. Meet with ACA Directors for SME assessments 4/14
3. Apply results of technology feedback.

Tuesday, April 1, 2008

15/5 April 1, 2008

This past week has been one of our busiest; from my opinion. Our development continues on our project. My assignment was to provide the example documents and guided practice for Unit One. This is the same unit for which I designed a storyboard so I was glad to work with material I had some familiarity. I am feeling a little overwhelmed due to my program comprehensive is scheduled for next Monday 4/7. Our dress rehearsal is next Thursday 4/10. Our project goes live 4/14. My portfolio defense is coming close and I am very overwhelmed.

I realize, this too shall pass, but I am really ready to be on the other side of all this. At this point I continue to work on my guided practice activities. I am proud of my drag & drop I was able to do in Flash. It was very time consuming but I believe it worked out well. I still have a few little items to clean up but other than that I think it is okay.

Work to do:
1. Finish guided practice.
2. Check content pages for continuity and completeness.
3. Add graphics to content pages.
4. Work on what else is needed.